Summary

<aside>

Project duration: 4-5 Weeks

Timeframe: May - July

</aside>

<aside>

IMG_4086 1.png

</aside>

Scope of Work

Project Phases

✅ Phase 1 — PreConstruction & Planning


✅  Phase 2 — Site Preparation & Slab Foundation


✅  Phase 3 — Framing & Structure


✅  Phase 4 — Metal Roofing


✅  Phase 5 — Polycarbonate Panel & Door Installation


✅  Phase 6 — Board and Batten Exterior Detailing

Total Investment


Next Steps

If you choose to move forward, use the form below to secure a spot in our project pipeline. Once submitted we will reach out to you to go over next steps.

Notes & Conditions

What's Included All materials, labor, project management, site cleanup, and a final walkthrough. One-year workmanship warranty from date of completion. Manufacturer warranties on materials are passed through to the owner.

What's Not Included Tree removal, gutters, interior shelving or benches, plumbing, HVAC, low-voltage or security wiring, and any furniture or equipment inside the structure. Any of these can be quoted separately.

Change Orders Any work outside this scope will be documented in writing with a cost and timeline impact before it begins. No additional work starts without written owner approval.

Site Assumptions Assumes a flat, accessible site with stable soil and concrete truck access. Underground electrical run estimated at 75 feet from the existing main panel. If conditions differ — rock, longer run, significant grading — we'll discuss and quote the difference before proceeding.

Foundation Note Slab is specified as a 4-inch monolithic pour. If frost footings are required, additional foundation work will be quoted as a change order.